| Client / Site | Agthia Egypt |
| Location | EL-Sadat City |
| Client’s need / Requirements | Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. |
| Project | Industrial wastewater treatment plant is designed to produce water with quality matching Egyptian standards for wastewater discharge 1500 m3/day. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |


