| Client / Site | EPCON Contracting |
| Location | EL-Galala |
| Client’s need / Requirements |
Implement a wastewater treatment plant of 500m3/day capacity. Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. |
| Project |
Advanced sewage treatment plant is designed to treat municipal wastewater for reuse Ultra-filtration technology produce water with high quality that matches the the Egyptian laws for advanced treated water reuse in irrigation of fruitful trees. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |