| Client / Site | Golden Beach |
| Location | Ras Sudr, Egypt |
| Client’s need / Requirements |
BWRO water treatment plant. |
| Project |
-Fully controlled compact system with small footprint. -High technology RO membrane elements for low differential pressure. -Water type: Brackish Well Non-Fouling. -Capacity: up to 150 m3/day. -Recovery: up to 55%. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy. • Reduced carbon emissions. • Lower maintenance cost. |

