Chipsy Industrial Wastewater Treatment and Reuse Plant
| Client / Site | Chipsy Egypt |
| Location | 6th october |
| Client’s need / Requirements |
Industrial Wastewater treatment and reuse plant of 540m3/day capacity. Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. |
| Project |
– In progress – Industrial wastewater treatment plant upgrade is designed to accommodate the increase in organic load (soluble COD) due to increasing water saving. – The plant will produce water with superior quality exceeds Egyptian standards for reuse in irrigation. – Project capacity is 540 m3/day, recovery ratio is up to 70%, and permeate water is 360m3/day. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |
Chipsy New Advanced Industrial Wastewater Aeration
| Client / Site | Chipsy Egypt |
| Location | Egypt |
| Client’s need / Requirements |
Industrial wastewater reuse project of 2000m3/day capacity Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. |
| Project |
-Re-designing old aeration system to new advanced industrial wastewater aeration system. -The integrated design was able to achieve the main goal of the project to enhance aeration efficiency with proven energy savings, reduced carbon emissions, and lower maintenance cost. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |
Chipsy Assiut Industrial Wastewater Treatment Plant Upgrade
| Client / Site | Chipsy Egypt |
| Location | Assiut |
| Client’s need / Requirements |
Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. Industrial wastewater treatment plant upgrade of 500m3/day capacity. |
| Project |
-Industrial wastewater treatment plant revamping and upgrade. -The produced water that matches the Egyptian laws for advanced treated water reuse in irrigation. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |
Industrial Wastewater Plant Upgrade
| Client / Site | CHIPSY |
| Location | 6th October |
| Client’s need / Requirements | Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings. |
| Project | Designing and operating new advanced industrial wastewater aeration system for SBR biological treatment process; in cooperation with our German Partner PPU- Umwelttechnik GmbH. |
| Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |