| Client / Site | Waste Water Company |
| Location | Alexandria, Egypt |
| Client’s need / Requirements | Waste Water Co. required the pump station. |
| Project | Project is install multi-stage submersible pumps. |
| Objective | Multi-Stage submersible pumps are 50 Kw for waste water treatment plant, pump station produces 1.100 m3/hr. |