Client / Site | PepsiCo Egypt |
Location | 6th of October, Egypt |
Client’s need / Requirements | Industrial wastewater treatment and reuse plant of 1600 m3/day capacity |
Project |
“In progress” -The retrofit of the IWWTPs with capacity 1600 m3/d re-designed based on advanced MBR biological treatment to be able to meet more strict governmental regulations as well as prepare for partial reuse opportunities. -The retrofit of the existing IWWTP to conform with new strict discharge limits utilizing the existing infra-structure while conservative hydraulic and organic loading. |
Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |