Client / Site | PepsiCo Fritolay Pakistan |
Location | Pakistan |
Client’s need / Requirements | Industrial wastewater treatment plant of 360m3/day capacity. |
Project | Industrial wastewater treatment plant is designed to produce water with required quality of 360 m3/day capacity. |
Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |