Mondelez RO Water Treatment Plant

describtion

 

Client / Site Mondelez
Location Borg el Arab, Alexandria, Egypt
Client’s need / Requirements

RO water treatment plant for reuse as make-up water .

Project

-Produced water will be used as make up water for boiler to reduce boiler blow down, chemical consumption and fuel consumption.

-Capacity: 200-240 m3/day

-Recovery: up to 75%

Objective The new system was able to:
• Enhance aeration efficiency.
• Save energy,
• Reduced carbon emissions.
• Lower maintenance cost.

share

0

Your Cart