Client / Site | Mondelez |
Location | Borg el Arab, Alexandria, Egypt |
Client’s need / Requirements |
RO water treatment plant for reuse as make-up water . |
Project |
-Produced water will be used as make up water for boiler to reduce boiler blow down, chemical consumption and fuel consumption. -Capacity: 200-240 m3/day -Recovery: up to 75% |
Objective | The new system was able to: • Enhance aeration efficiency. • Save energy, • Reduced carbon emissions. • Lower maintenance cost. |