Golden Beach Water Treatment Plant

describtion

 

Client / Site Golden Beach
Location Ras Sudr, Egypt
Client’s need / Requirements

BWRO water treatment plant.

Project

-Fully controlled compact system with small footprint.

-High technology RO membrane elements for low differential pressure.

-Water type: Brackish Well Non-Fouling.

-Capacity: up to 150 m3/day.

-Recovery: up to 55%.

Objective The new system was able to:
• Enhance aeration efficiency.
• Save energy.
• Reduced carbon emissions.
• Lower maintenance cost.

share

0

Your Cart