EL-Galala sewage treatment plant

describtion

Client / Site EPCON Contracting
Location EL-Galala
Client’s need / Requirements

Implement a wastewater treatment plant of 500m3/day capacity.

Enhance wastewater treatment process and be able to handle the high organic load concentrations, while preserving the increase in the production rate and water savings.

Project

Advanced sewage treatment plant is designed to treat municipal wastewater for reuse

Ultra-filtration technology produce water with high quality that matches the the Egyptian laws for advanced treated water reuse in irrigation of fruitful trees.

Objective The new system was able to:
• Enhance aeration efficiency.
• Save energy,
• Reduced carbon emissions.
• Lower maintenance cost.