In June 2016,Purichem was assigned to supply& install RO plant responsible for recycling reject water from existing RO plant, reject water recycling plant capacity is 650 m3/day.
PuriChem has accomplished commissioning and installation Pump Station for Tabark Company
In July 2015, Purichem was assigned to supply & install pump station for Tabark company ,for Antoniads project.
PuriChem has accomplished commissioning and installation Pump Station for Waste water company
In July 2015, Purichem was assigned to supply & install two multi-stage submersible pump 50 Kw each for waste water treatment planet ,pump station produces 1.100 m3/hr.
PuriChem has accomplished commissioning and startup of Waste Water treatment plant at Exxon Mobil
in May 2015, Purichem was assigned to supply , commission and start-up turn-key industrial waste water treatment plant for COD reducing using AOP (Advanced Oxidation Process ) with overall productivity 5 m3/hr.
PuriChem has accomplished commissioning and startup of Waste Water treatment plant at Alex Carbon Black (ACB)
In January 2015, Purichem was assigned to supply , commission and start-up turn-key sewage water treatment plant 75 m3/day using SBR technology to be reused for irrigation purposes.
Purichem was responsible for Modifying the waste water treatment plant at Chipsy
In January 2015, Purichem was assigned to modify Chipsy’s industrial waste water planet to meet regulations
for discharge & prepare it for future recycling.
New equipment and instrumentation were supplied to the WWTP and the results were more than satisfactory.
PuriChem succeeded to apply its special engineering product PCS-500
In Jan 2015, PuriChem succeeded to apply its special engineering product PCS-500; Sea Water Reverse Osmosis Desalination Plant with (500 m3/day) capacity. Its smart design reaches the aiming global energy consumption standards without using energy recovery system. Also all machinery, instrumentation and spare parts are heave duty, and totally in compliance with global quality parameters.
New Interactive Animated LED Fountains
In Jan. 2015, PuriChem was responsible for Water Fountain Equipment Supply, installation & Start-up at Ezz el Dekhila’s site. It is an architectural one with LED light and changeable RGB color.
Purichem was responsible for Modifying the waste water treatment plant at Pepsico
In May 2014, PuriChem was assigned to modify PepsiCo’s existing out of service waste water treatment plant for recycling reject water from existing 2 working plants . New equipment and instrumentations were supplied to the WWTP and the results were more than satisfactory.
One of Purichem's major projects was with Antoniadis for Tourism and Urban development Co.
In April 2014, PuriChem signed a contract with Antoniadis for Tourism and Urban development Co. for supply, installation, commissioning and start-up of Grundfos Boosting and Firefighting Systems for approximately 56 residential buildings. This project was a huge added value to our experience in boosting and firefighting systems in addition to water treatment systems and other areas of expertise.